PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripping Shear Wall Panels at Elev. 1,2,3 Facing South-East (800x600).jpg Concrete prep. Facing North-East(800x600).jpg Footing area at Elev. 7, Stair -4,-5 Facing North (800x600).jpg Poured wall forms at Column Line L-M Facing North-East (800x600).jpg Setting up the Curtain wall Mockup next to MAST Trailer (800x600).jpg Stripping Shear wall forms at Elev. 1,2,3 Facing North-East (800x600).jpg Wall Froms at Monumental Stairs Facing East(800x600).jpg
Previous pageNext page Setting up the Curtain wall Mockup next to MAST Trailer (800x600)
Setting up the Curtain wall Mockup next to MAST Trailer (800x600)